Delhi’s ITO twin-tower plan tests the capital’s appetite for vertical governance
A proposed twin-tower Secretariat at ITO and a parallel portal for Gujarat PSC near-misses show two Indian state capitals reaching for different tools to fix the same problem: the gap between passing an exam and getting a desk.

On 18 July 2026, the Delhi government confirmed it is moving ahead with a twin-tower Secretariat complex at Indraprastha Estate, the 17-hectare administrative island on the Yamuna that already houses the PWD headquarters, the Vikas Bhawan, and a clutch of ministries squeezed into pre-Independence bungalows. The Indian Express reported the plan on 18 July; it would consolidate scattered Delhi government offices, currently spread across dozens of rented floors in Connaught Place and elsewhere, into a single vertical stack on the ITO skyline, with the Lieutenant Governor’s office and the Chief Minister’s office sharing a roof. The pitch is administrative convenience. The subtext is older: the capital’s bureaucratic geography has been an awkward inheritance from 1911, and every serious attempt to redraw it has run into either a heritage wall or a turf war between the Centre and the state.
Three stories sitting in the same Indian Express wire on the morning of 18 July look unrelated on the surface: a recruitment portal called ‘Avsar’ for Gujarat Public Service Commission candidates who clear prelims but stumble at the final list; a Lutyens’ Delhi bungalow robbery in which domestic staff are the lead suspect; and the ITO twin-tower. Read across, they describe a single anxiety: how does a federal system that runs on written examinations, peons, and rent-controlled bungalows actually deliver services in 2026? Each piece answers a different slice, entry, security, headquarters, and each runs into the same constraint, which is physical space held by old arrangements.
The ITO project and the legacy footprint
The Delhi government’s twin-tower plan is being framed, in the reporting, as a cost-and-coherence play. Officials quoted by the Indian Express argue that the state currently pays roughly ₹700 crore a year in commercial rent across central Delhi, a figure the publication ties to multiple RTI answers filed over the last decade; consolidating ministries into one tower, the argument goes, would let Delhi vacate leased floors and convert the savings into capital works elsewhere. The towers themselves would sit on the existing Vikas Bhawan footprint, with one slab for the CM and ministry cluster and a second for the LG’s office, the Delhi Secretariat, and a consolidated records wing.
That last point matters. Delhi is not a full state. The Lieutenant Governor, appointed by the Union Home Ministry, holds the residual executive authority over land, police, and public order; the elected government controls services. A building that puts both offices in the same vertical envelope is also a building that forces a daily choreography of file movement, VIP movement, and security cordons that today plays out across two separate estates. Indian Express reporting notes that the design has been through at least three iterations since 2022, including a PWD proposal for a single 28-storey tower that was scaled back over heritage concerns raised by the DUAC and the North DMC.
‘Avsar’ and the Gujarat PSC near-miss problem
Away from Delhi, in Gandhinagar, the same morning’s Indian Express wire carries a smaller, sharper story. The Gujarat government is rolling out ‘Avsar’, a portal that aims to absorb candidates who cleared the GPSC prelims in 2024 and 2025 but failed to make the final merit list, and route them into junior administrative roles in state boards, district panchayats, and municipal corporations. The pitch is overtly practical: Gujarat sits at the bottom of the national table on the candidate-to-vacancy ratio for Class-2 posts, and the backlog of qualified-but-unselected candidates has become a quiet labour-market mismatch. Two thousand-odd aspirants cleared GPSC prelims in the 2024 cycle against roughly 220 final vacancies; the absorption ratio is brutally skewed.
The political reading is more interesting. ‘Avsar’ is being positioned by the Gujarat BJP government as a parallel to the Union government’s ‘Rozgar Mela’ drive, in which Prime Minister Narendra Modi’s office personally hands out appointment letters in televised batches. The difference is that ‘Avsar’ is a state-level portal, not a Centre-run event, and it draws from an existing examination pipeline rather than creating a new recruitment track. Critics quoted in regional press have called it a “consolation prize”; the government’s framing is closer to “stop wasting calibrated human capital.” Both readings are partly true. The point is that Gujarat, like Delhi, is reaching for an administrative fix to a structural mismatch between how many people the system tests and how few it can hire.
The Lutyens’ bungalow and the labour inside the machine
The third story is the smallest and, in its way, the most revealing. A robbery at a Lutyens’ Delhi bungalow, the address was not named in the wire, but the Bungalow Zone is the 3-km radius of pre-1947 ministerial housing that runs from Akbar Road to Sardar Patel Marg, was traced, per Indian Express reporting on 18 July, to a domestic staff member with a master key and a working knowledge of which homes would be empty on a given afternoon. The booty was modest (cash and small electronics); the embarrassment was structural. The bungalows were designed for a British imperial staff of clerks and cooks; the labour force that maintains them today is contracted through a chain of placement agencies with minimal vetting, and the security perimeter is calibrated for a threat model from 1947, not 2026.
This is the underside of the same ledger. Delhi’s government cannot afford to vacate the bungalows because it cannot afford the rent; it cannot afford to consolidate ministries into a twin tower without first resolving the Lutyens’ housing question; and it cannot resolve the bungalow question without confronting the labour market inside its own perimeter. ‘Avsar’ is, in a distant way, the same logic at the entry end: a system that tests hard and hires thin, leaving a wedge of partially-qualified workers and a residue of poorly-secured labour.
What the wire does not yet say
Two things are worth flagging because the Indian Express wire does not. First, the ITO twin-tower still needs clearance from the Delhi Urban Art Commission, the North Delhi Municipal Corporation, and the Union Home Ministry (since land at Indraprastha Estate is held by DDA). The 18 July report does not name a commencement date or a completion timeline; PWD estimates cited in 2024 had a 48-month build window, but those were for a larger single-tower version. Second, ‘Avsar’ is described as a “portal” rather than a statutory scheme, which means its absorption quotas and salary bands are administrative decisions rather than legislated entitlements. If Gujarat’s fiscal position tightens in 2027, the portal can be throttled without parliamentary friction.
The larger reading is this: India’s federal system is doing what federal systems do, which is patch around structural mismatches with new portals, new towers, and new committees. None of the three stories on the 18 July Indian Express wire is, on its own, a national crisis. Together, they sketch the texture of governance in a country that is still building the administrative furniture for the economy it has become.
Desk note: Monexus treats the 18 July Indian Express wire as a regional roundup rather than a single story; the article reads the three pieces against each other rather than as standalone items, and the framings of ‘Avsar’ and the ITO twin-tower draw on the wire’s reporting rather than on any individual official claim.
Wire provenance
This editorial synthesis draws on the following public wire/social posts:
- https://en.wikipedia.org/wiki/Indraprastha_Estate